Minimizing makespan in hybrid flowshops
- 1 October 1994
- journal article
- Published by Elsevier in Operations Research Letters
- Vol. 16 (3) , 149-158
- https://doi.org/10.1016/0167-6377(94)90026-4
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Planning and scheduling approaches to operate a particular FMSEuropean Journal of Operational Research, 1992
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- A state-of-the-art review of parallel-machine scheduling researchEuropean Journal of Operational Research, 1990
- Scheduling algorithms for flexible flowshops: Worst and average case performanceEuropean Journal of Operational Research, 1989
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraintsAnnals of Operations Research, 1985
- Design, planning, scheduling, and control problems of flexible manufacturing systemsAnnals of Operations Research, 1985
- A loading and dispatching problem in a random flexible manufacturing systemInternational Journal of Production Research, 1985
- Scheduling in a two-stage manufacturing processInternational Journal of Production Research, 1984
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954