Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part I:: prediction of nitrogen removal and sludge production
- 30 June 2001
- journal article
- research article
- Published by Elsevier in Water Research
- Vol. 35 (9) , 2235-2245
- https://doi.org/10.1016/s0043-1354(00)00514-5
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- A general model for single-sludge wastewater treatment systemsPublished by Elsevier ,2003
- Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part II:: prediction of phosphorus removalWater Research, 2001
- Calibration and validation of activated sludge model no. 3 for Swiss municipal wastewaterWater Research, 2000
- Activated Sludge Model No. 3Water Science & Technology, 1999
- The implementation of biokinetics and conservation principles in ASIMWater Science & Technology, 1995
- Prediction of the performance of enhanced biological phosphorus removal plantsWater Science & Technology, 1994
- Nitrogen removal in activated sludge systems including denitrification in secondary clarifiersWater Science & Technology, 1994
- Estimation of Kinetic Parameters of Heterotrophic Biomass under Aerobic Conditions and Characterization of Wastewater for Activated Sludge ModellingWater Science & Technology, 1992
- Characterisation of Domestic Wastewater for Mathematical Modelling of the Activated Sludge ProcessWater Science & Technology, 1991