Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part II:: prediction of phosphorus removal
- 30 June 2001
- journal article
- Published by Elsevier in Water Research
- Vol. 35 (9) , 2246-2255
- https://doi.org/10.1016/s0043-1354(00)00515-7
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- The eawag bio-p module for activated sludge model no. 3Water Research, 2001
- Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part I:: prediction of nitrogen removal and sludge productionWater Research, 2001
- Calibration and validation of activated sludge model no. 3 for Swiss municipal wastewaterWater Research, 2000
- Modelling biological phosphorus and nitrogen removal in a full scale activated sludge processWater Research, 1999
- Kinetics of biologically induced phosphorus precipitation in waste-water treatmentWater Research, 1999
- Potential of denitrification and solids removal in the rectangular clarifierWater Research, 1999
- Reduction of biomass decay rate under anoxic and anaerobic conditionsWater Science & Technology, 1999
- Principles in the design of single‐sludge activated‐sludge systems for biological removal of carbon, nitrogen, and phosphorusWater Environment Research, 1997
- Steady-state analysis to evaluate the phosphate removal capacity and acetate requirement of biological phosphorus removing mainstream and sidestream process configurationsWater Research, 1996
- Prediction of the performance of enhanced biological phosphorus removal plantsWater Science & Technology, 1994