Unit sized transfer batch scheduling with setup times
- 30 April 1992
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 22 (2) , 177-183
- https://doi.org/10.1016/0360-8352(92)90045-l
Abstract
No abstract availableKeywords
This publication has 5 references indexed in Scilit:
- An Efficient Implementation of a Two-stage Production Scheduling AlgorithmJournal of the Operational Research Society, 1989
- Sequency on two and three machines with setup, processing and removal times separatedInternational Journal of Production Research, 1983
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954