Simulation of Nonsteady Construction Processes
- 1 June 1989
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 115 (2) , 163-178
- https://doi.org/10.1061/(asce)0733-9364(1989)115:2(163)
Abstract
Construction, with its uniqueness and unusual operational characteristics, faces special handicaps dealing with process planning and control. In order to study the productivity and the resource efficiency of construction operations, one has to consider the impact of a wide variety of factors. This paper presents a framework for the identification of sources of process delays. It focuses on the study of the relationship between storage limitations of flow units within a production system and the productivity of the system. In addition, the effect of breakdown delays in combination with different storage conditions are discussed. The CYCLONE (CYCLic Operations Network) modeling and simulation technique was used as an analytical tool for this study. Enhancements to the existing Micro‐CYCLONE simulation program, which enable it to handle the necessary new modeling elements, will be introduced. The analysis shows that generally higher storage constraints result in higher overall productivity. However, certain ...Keywords
This publication has 6 references indexed in Scilit:
- Automation and Robotics for ConstructionJournal of Construction Engineering and Management, 1985
- Implementation of Foreman-Delay SurveysJournal of the Construction Division, 1982
- Can Work Sampling Lower Construction Costs?Journal of the Construction Division, 1981
- Cyclone–Method for Modeling Job Site ProcessesJournal of the Construction Division, 1977
- Modeling Method-ProductivityJournal of the Construction Division, 1976
- Planning Construction of Repetitive Building UnitsJournal of the Construction Division, 1974