MRP with uncertainty: a review and some extensions
- 31 December 1991
- journal article
- review article
- Published by Elsevier in International Journal of Production Economics
- Vol. 25 (1-3) , 51-64
- https://doi.org/10.1016/0925-5273(91)90130-l
Abstract
No abstract availableThis publication has 20 references indexed in Scilit:
- Evaluating the impact of operating environments on MRP system nervousnessInternational Journal of Production Research, 1989
- MRP with high uncertain yield lossesJournal of Operations Management, 1984
- A simulation-based experimental investigation of supply/timing uncertainty in MRP systemsInternational Journal of Production Research, 1984
- Dynamic Lot-Sizing When Demand Timing Is UncertainOperations Research, 1984
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- Stochastic material requirements planning for optional parts†International Journal of Production Research, 1983
- COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZINGDecision Sciences, 1983
- Analysis of material and capacity requirements with Q-GERTInternational Journal of Production Research, 1982
- Lot sizing and safety stock decisions in an MRP system with demand uncertaintyEngineering Costs and Production Economics, 1982
- MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTYDecision Sciences, 1976