Production planning for companies with product recovery and remanufacturing capability
- 22 November 2002
- proceedings article
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 285-290
- https://doi.org/10.1109/isee.1997.605342
Abstract
No abstract availableThis publication has 14 references indexed in Scilit:
- Asset cycle management-a total approach to product design for the environmentPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- The strategic and competitive implications of recycling and design for disassembly in the electronics industryPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Evaluation approach for environmental impact and yield trade-offs for electronics manufacturing product and process alternativesPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Determination of a disassembly strategyInternational Journal of Production Research, 1996
- Scheduling disassemblyInternational Journal of Production Research, 1994
- The Recovery Problem in Product DesignJournal of Engineering Design, 1994
- A cost-benefit analysis model of product design for recyclability and its applicationIEEE Transactions on Components, Packaging, and Manufacturing Technology: Part A, 1994
- A Key Issue in Product Life Cycle: DisassemblyCIRP Annals, 1993
- The Life Cycle Concept as a Basis for Sustainable Industrial ProductionCIRP Annals, 1993
- Design for Assembly and DisassemblyCIRP Annals, 1992