On the Srikar-Ghosh MILP model for the iVx M SDST flowshop problem
- 1 October 1990
- journal article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 28 (10) , 1817-1830
- https://doi.org/10.1080/00207549008942836
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing ProblemJournal of the Operational Research Society, 1988
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up timesInternational Journal of Production Research, 1986
- njobs andmmachines job-shop problems with sequence-dependent set-up timesInternational Journal of Production Research, 1982
- An Evaluation of Flow Shop Sequencing HeuristicsManagement Science, 1977
- Optimal flowshop schedules with no intermediate storage spaceNaval Research Logistics Quarterly, 1976
- A HEURISTIC ALGORITHM FOR THE FLOWSHOP PROBLEM WITH A COMMON JOB SEQUENCE ON ALL MACHINES*Decision Sciences, 1975
- Technical Note—An Elimination Method for the Flow-Shop ProblemOperations Research, 1975
- A Heuristic Algorithm for the n Job, m Machine Sequencing ProblemManagement Science, 1970
- Application of the Branch and Bound Technique to Some Flow-Shop Scheduling ProblemsOperations Research, 1965
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954