Bicriterion static scheduling research for a single machine
- 1 January 1988
- Vol. 16 (1) , 53-59
- https://doi.org/10.1016/0305-0483(88)90008-4
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- A note on the single‐machine scheduling problem with minimum weighted completion time and maximum allowable tardinessNaval Research Logistics Quarterly, 1986
- Multi-product batch production on a single machine—A problem revisitedOmega, 1985
- A state-of-art survey of static scheduling research involving due datesOmega, 1984
- Scheduling to minimize the weighted sum of completion times with secondary criteriaNaval Research Logistics Quarterly, 1976
- Conditions for Optimal Scheduling for the Three-machine ProblemIMA Journal of Applied Mathematics, 1976
- A note on a scheduling problem with dual criteriaNaval Research Logistics Quarterly, 1975
- One machine sequencing to minimize mean flow time with minimum number tardyNaval Research Logistics Quarterly, 1975
- A note on the extension of a result on scheduling with secondary criteriaNaval Research Logistics Quarterly, 1972
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954