Leak-before-break qualification of primary heat transport piping of 500MWe Tarapur atomic power plant
- 1 April 1999
- journal article
- Published by Elsevier in International Journal of Pressure Vessels and Piping
- Vol. 76 (4) , 221-243
- https://doi.org/10.1016/s0308-0161(98)00134-3
Abstract
No abstract availableThis publication has 8 references indexed in Scilit:
- Leak-before-break qualification of primary heat transport piping of 500MWe Tarapur atomic power plantInternational Journal of Pressure Vessels and Piping, 1999
- Tensile and fracture properties evaluation of PHT system piping material of PHWRInternational Journal of Pressure Vessels and Piping, 1998
- Leak-before-break application in US light water reactor balance-of-plant pipingInternational Journal of Pressure Vessels and Piping, 1990
- Assessment of the integrity of structures containing defectsInternational Journal of Pressure Vessels and Piping, 1988
- Energy release rate along a three-dimensional crack front in a thermally stressed bodyInternational Journal of Fracture, 1986
- Application of fracture-proof design methods using tearing-instability theory to nuclear piping postulating circumferential through-wall cracksPublished by Office of Scientific and Technical Information (OSTI) ,1983
- The Theory of Instability of the Tearing Mode of Elastic-Plastic Crack GrowthPublished by ASTM International ,1979
- The Two-Phase Critical Discharge of Initially Saturated or Subcooled LiquidNuclear Science and Engineering, 1970