Solving scheduling problems using Petri nets and constraint logic programming
Open Access
- 1 January 1998
- journal article
- Published by EDP Sciences in Rairo-Operations Research
- Vol. 32 (2) , 125-143
- https://doi.org/10.1051/ro/1998320201251
Abstract
No abstract availableThis publication has 15 references indexed in Scilit:
- Solving scheduling problems using Petri nets and constraint logic programmingPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Scheduling flexible manufacturing systems using Petri nets and heuristic searchIEEE Transactions on Robotics and Automation, 1994
- Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systemsIntelligent Systems Engineering, 1994
- Extending chip in order to solve complex scheduling and placement problemsMathematical and Computer Modelling, 1993
- Practice of Petri Nets in ManufacturingPublished by Springer Nature ,1993
- Parallel and sequential mutual exclusions for petri net modeling of manufacturing systems with shared resourcesIEEE Transactions on Robotics and Automation, 1991
- On the Srikar-Ghosh MILP model for the iVx M SDST flowshop problemInternational Journal of Production Research, 1990
- Petri nets: Properties, analysis and applicationsProceedings of the IEEE, 1989
- Optimization + objectivity = optoutEuropean Journal of Operational Research, 1977
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954