A new heuristic algorithm based on GAs for multiprocessor scheduling with task duplication
- 23 November 2002
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Dynamic critical-path scheduling: an effective technique for allocating task graphs to multiprocessorsIEEE Transactions on Parallel and Distributed Systems, 1996
- A New Approach to Scheduling Parallel Programs Using Task DuplicationPublished by Institute of Electrical and Electronics Engineers (IEEE) ,1994
- A Task Duplication Based Optimal Scheduling Algorithm for Variable Execution Time TasksPublished by Institute of Electrical and Electronics Engineers (IEEE) ,1994
- A genetic algorithm for multiprocessor schedulingIEEE Transactions on Parallel and Distributed Systems, 1994
- DSC: scheduling parallel tasks on an unbounded number of processorsIEEE Transactions on Parallel and Distributed Systems, 1994
- On the granularity and clustering of directed acyclic task graphsIEEE Transactions on Parallel and Distributed Systems, 1993
- Towards an Architecture-Independent Analysis of Parallel AlgorithmsSIAM Journal on Computing, 1990
- Grain size determination for parallel processingIEEE Software, 1988
- Solving Linear Algebraic Equations on an MIMD ComputerJournal of the ACM, 1983