Techniques of corona loss measurement and analysis-500-kv test project of the american gas and electric company
- 1 July 1951
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in Transactions of the American Institute of Electrical Engineers
- Vol. 70 (1) , 496-506
- https://doi.org/10.1109/t-aiee.1951.5060434
Abstract
No abstract availableKeywords
This publication has 6 references indexed in Scilit:
- Radio Influence Tests in Field and Laboratory - 500-Kv Test Project of the American Gas and Electric CompanyTransactions of the American Institute of Electrical Engineers, 1951
- A Voltage Gradient MeterTransactions of the American Institute of Electrical Engineers, 1950
- Corona Considerations on High-Voltage Lines and Design Features of Tidd 500-Kv Test LinesTransactions of the American Institute of Electrical Engineers, 1947
- Transmission of Electric Power at Extra High VoltagesTransactions of the American Institute of Electrical Engineers, 1947
- Switchgear Equipment for Tidd High-Voltage Test LinesTransactions of the American Institute of Electrical Engineers, 1947
- Insulators and Line Hardware for Tidd 500-KV Test LinesTransactions of the American Institute of Electrical Engineers, 1947