Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- 31 October 1996
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 23 (10) , 909-916
- https://doi.org/10.1016/0305-0548(96)00012-3
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- A note on minimizing the expected makespan in flowshops subject to breakdownsNaval Research Logistics (NRL), 1995
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic BreakdownsJournal of the Operational Research Society, 1995
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective functionEuropean Journal of Operational Research, 1995
- Two-machine ordered flowshop scheduling under random breakdownsMathematical and Computer Modelling, 1994
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy PenaltiesOperations Research, 1993
- Job lateness in a two-machine flowshop with setup times separatedComputers & Operations Research, 1991
- Focused Scheduling in Proportionate FlowshopsManagement Science, 1985
- Minimizing the Expected Makespan in Stochastic Flow ShopsOperations Research, 1982
- Minimizing Maximum Lateness in a Two-Machine Open ShopMathematics of Operations Research, 1981
- Complexity of Machine Scheduling ProblemsPublished by Elsevier ,1977