Job lateness in a two-machine flowshop with setup times separated
- 31 December 1991
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 18 (6) , 549-556
- https://doi.org/10.1016/0305-0548(91)90060-5
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- Scheduling of a Two-machine Flowshop with Processing Time Linearly Dependent on Job Waiting-timeJournal of the Operational Research Society, 1989
- On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing ProblemJournal of the Operational Research Society, 1988
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- On Johnson's Two-Machine Flow Shop with Random Processing TimesOperations Research, 1986
- Minimizing Maximum Lateness in a Two-Machine Open ShopMathematics of Operations Research, 1981
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence RelationsOperations Research, 1979
- Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954