Export/import of spinning reserve in interconnected generation systems
- 1 January 1991
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 6 (1) , 43-50
- https://doi.org/10.1109/59.131046
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Unit commitment in interconnected generating systems using a probabilistic techniqueIEEE Transactions on Power Systems, 1990
- Risk constrained economic load dispatch in interconnected generating systemsIEEE Transactions on Power Systems, 1990
- Assessment of spinning reserve in interconnected generation systems with export/import constraintsIEEE Transactions on Power Systems, 1989
- Operating reserve assessment in interconnected generating systemsIEEE Transactions on Power Systems, 1988
- IEEE Reliability Test SystemIEEE Transactions on Power Apparatus and Systems, 1979
- Economic Allocation of Regulating MarginIEEE Transactions on Power Apparatus and Systems, 1971
- Large Scale Hydro-Thermal Unit Commitment-Method and ResultsIEEE Transactions on Power Apparatus and Systems, 1971
- An Application of Mixed-Integer Programming Duality to Scheduling Thermal Generating SystemsIEEE Transactions on Power Apparatus and Systems, 1968
- Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical SystemsIEEE Transactions on Power Apparatus and Systems, 1966
- A Method for Planning Economic Unit Commitment and Maintenance of Thermal Power SystemsIEEE Transactions on Power Apparatus and Systems, 1966