Unit commitment scheduling with stochastic reserve constraint
- 1 December 1981
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 444-450
- https://doi.org/10.1109/cdc.1981.269564
Abstract
A new approach, based on branch-and-bound techniques, has been developed for solving the unit commitment problem. The method (i) assumes no priority ordering, (ii) allows time-dependent start-up costs and (iii) directly takes into consideration unit outages and uncertain demand in the reserve constraint. Preliminary computational results are reported.Keywords
This publication has 13 references indexed in Scilit:
- Evaluation of Dynamic Programming Based Methods and Multiple area Representation for Thermal Unit CommitmentsIEEE Transactions on Power Apparatus and Systems, 1981
- Expected Energy Production Costs by the Method of MomentsIEEE Transactions on Power Apparatus and Systems, 1980
- An Application of Lagrangian Relaxation to Scheduling in Power-Generation SystemsOperations Research, 1977
- Optimal short-term thermal unit commitmentIEEE Transactions on Power Apparatus and Systems, 1976
- Power System Simulation Model Based on Probability AnalysisIEEE Transactions on Power Apparatus and Systems, 1972
- Large Scale Hydro-Thermal Unit Commitment-Method and ResultsIEEE Transactions on Power Apparatus and Systems, 1971
- An Application of Mixed-Integer Programming Duality to Scheduling Thermal Generating SystemsIEEE Transactions on Power Apparatus and Systems, 1968
- Discrete Optimization Via Marginal AnalysisManagement Science, 1966
- Branch-and-Bound Methods: A SurveyOperations Research, 1966
- Generalized Lagrange Multiplier Method for Solving Problems of Optimum Allocation of ResourcesOperations Research, 1963