A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
- 1 January 1988
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 33 (1) , 30-41
- https://doi.org/10.1016/0377-2217(88)90251-2
Abstract
No abstract availableThis publication has 14 references indexed in Scilit:
- Two level heuristic for the resource constrained scheduling problemInternational Journal of Production Research, 1986
- An application of multiple criteria decision making principles for planning machining operationsIIE Transactions, 1984
- New directions in scheduling theoryOperations Research Letters, 1984
- Job shop scheduling optimization in real-time production controlComputers in Industry, 1983
- Master production scheduling: a multiple-objective linear programming approachInternational Journal of Production Research, 1983
- A survey of flexible manufacturing systemsJournal of Manufacturing Systems, 1982
- Multiple criteria job-shop schedulingComputers & Operations Research, 1982
- A Review of Production SchedulingOperations Research, 1981
- On the interactive solution to a multicriteria scheduling problemMathematical Methods of Operations Research, 1980
- Interactive Scheduling: Historical Survey and State of the ArtA I I E Transactions, 1978