Site‐Level Construction Information System
- 1 December 1992
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 118 (4) , 701-715
- https://doi.org/10.1061/(asce)0733-9364(1992)118:4(701)
Abstract
This paper defines information requirements to support decision‐making needs of site‐level personnel constructing a facility. It focuses on information required to drive the process, rather than technical information for design‐related problems. The site‐level construction information system (SCIS) builds upon basic decision‐making theory and a common understanding of the construction process, as represented by the conceptual construction process model. SCIS consists of a four‐step process: (1) Establish a matrix of the key project decisions; (2) define the project control system for the given project; (3) establish methods to select the decision‐making mechanism, collect information, and implement decision; and (4) propose a method for monitoring the site information system. A case study illustrates key components of this method. A strategy for implementation then follows. The information model presented allows for information gathered from the formal project control system, informal information communication, and unstructured observations on site, to be integrated into a site‐level construction information system.Keywords
This publication has 5 references indexed in Scilit:
- Conceptual Construction Process ModelJournal of Construction Engineering and Management, 1988
- Implementation of Foreman-Delay SurveysJournal of the Construction Division, 1982
- Cyclone–Method for Modeling Job Site ProcessesJournal of the Construction Division, 1977
- Organization Design: An Information Processing ViewInterfaces, 1974
- The new science of management decision.Published by American Psychological Association (APA) ,1960