Single machine scheduling to minimize weighted earliness subject to no tardy jobs
- 31 March 1988
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 34 (2) , 221-230
- https://doi.org/10.1016/0377-2217(88)90356-6
Abstract
No abstract availableThis publication has 8 references indexed in Scilit:
- A note on the single‐machine scheduling problem with minimum weighted completion time and maximum allowable tardinessNaval Research Logistics Quarterly, 1986
- ON THE USE OF DECOMPOSITION APPROACHES IN A SINGLE MACHINE SCHDULING PROBLEMJournal of the Operations Research Society of Japan, 1982
- ONE MACHINE SCHEDULING PROBLEM WITH DUAL CRITERIAJournal of the Operations Research Society of Japan, 1981
- Complexity of Machine Scheduling ProblemsPublished by Elsevier ,1977
- Scheduling to minimize the weighted sum of completion times with secondary criteriaNaval Research Logistics Quarterly, 1976
- A note on a scheduling problem with dual criteriaNaval Research Logistics Quarterly, 1975
- A note on the extension of a result on scheduling with secondary criteriaNaval Research Logistics Quarterly, 1972
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956