Economic uncertainties in water resources project design
- 1 August 1976
- journal article
- Published by American Geophysical Union (AGU) in Water Resources Research
- Vol. 12 (4) , 573-580
- https://doi.org/10.1029/wr012i004p00573
Abstract
No abstract availableThis publication has 12 references indexed in Scilit:
- Bayesian inference and decision making for extreme hydrologic eventsWater Resources Research, 1975
- SAMPLE UNCERTAINTY IN FLOOD LEVEE DESIGN: BAYESIAN VERSUS NON‐BAYESIAN METHODS1Jawra Journal of the American Water Resources Association, 1975
- Chance‐constrained dynamic programing and the optimization of water resource systemsWater Resources Research, 1974
- Induced safety algorithm for hydrologic design under uncertaintyWater Resources Research, 1974
- Watershed management: A systems approachWater Resources Research, 1972
- Bayesian decision theory applied to design in hydrologyWater Resources Research, 1972
- Relative Importance of Variables in Water Resources PlanningWater Resources Research, 1969
- Chance Constrained Programming with Joint ConstraintsOperations Research, 1965
- Deterministic Equivalents for Optimizing and Satisficing under Chance ConstraintsOperations Research, 1963
- Chance-Constrained ProgrammingManagement Science, 1959