Selection of roadway grades that minimize earthwork cost using linear programming
- 31 March 1988
- journal article
- Published by Elsevier in Transportation Research Part A: General
- Vol. 22 (2) , 121-136
- https://doi.org/10.1016/0191-2607(88)90024-6
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Earthwork Allocations with Nonconstant Unit CostsJournal of Construction Engineering and Management, 1987
- Stochastic Priority Model for Aggregate BlendingJournal of Construction Engineering and Management, 1985
- Optimization Model for Aggregate BlendingJournal of Construction Engineering and Management, 1985
- Construction Energy UseJournal of Construction Engineering and Management, 1984
- Earthmoving LogisticsJournal of the Construction Division, 1981
- Earthwork Transportation Allocations: Operations ResearchJournal of the Construction Division, 1981
- Optimum Size of Hauling UnitsJournal of the Construction Division, 1975
- Optimum Size of EquipmentJournal of the Construction Division, 1975
- Estimating Costs of Earthwork via SimulationJournal of the Construction Division, 1972