Application of Linear Scheduling
- 1 December 1986
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 112 (4) , 476-491
- https://doi.org/10.1061/(asce)0733-9364(1986)112:4(476)
Abstract
Many projects, such as the construction of roadways, pipelines, and high‐rise buildings, involve repetitive activities. A method for scheduling such work, the Linear Scheduling Method (LSM) is presented. In an LSM schedule, the repetitive activities are plotted as lines of constant or varying slopes on two axes, distance versus time. Discrete activities may be shown at their appropriate times and locations and then referenced to a network schedule for additional detail. The Linear Scheduling Method is illustrated by applying it to an actual roadway construction project. The simplicity of the system and advantages for certain types of projects are revealed. A sample schedule is used to derive information that is comparable to what may be obtained from an equivalent CPM network.Keywords
This publication has 5 references indexed in Scilit:
- Resource Sharing in Linear ConstructionJournal of Construction Engineering and Management, 1983
- Time Space Scheduling MethodJournal of the Construction Division, 1982
- Linear Scheduling Method for Highway ConstructionJournal of the Construction Division, 1981
- VPM Scheduling for High-Rise BuildingsJournal of the Construction Division, 1975
- Planning Construction of Repetitive Building UnitsJournal of the Construction Division, 1974