Scheduling mixed-model multi-level just-in-time production systems
- 1 September 1989
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 27 (9) , 1487-1509
- https://doi.org/10.1080/00207548908942636
Abstract
Many companies are converting their mixed-model multi-level production systems to just-in-time systems. This requires reducing set-up times so that small-lot production can be run. In this paper a theoretical basis is developed for scheduling these systems, and scheduling algorithms and heuristics are developed. The only other known scheduling method (the goal-chasing method), developed and used by Toyota, is shown to be a special case of these heuristics.Keywords
This publication has 9 references indexed in Scilit:
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production SystemsManagement Science, 1989
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated SystemsManagement Science, 1984
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyorInternational Journal of Production Research, 1979
- Optimal mixed-model sequencing for balanced assembly linesOmega, 1977
- Assembly line sequencing for model mixInternational Journal of Production Research, 1975
- Computer Simulation for Mixed-Model Production LinesManagement Science, 1973
- Production-Line Balances for Mixed-Model LinesManagement Science, 1972
- Mixed Model Line Balancing with Smoothed Station AssignmentsManagement Science, 1970