Lot streaming with attached setups in three-machine flow shops
- 1 November 1998
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 30 (11) , 1075-1084
- https://doi.org/10.1080/07408179808966564
Abstract
Lot streaming is the process of splitting a job or lot to allow overlapping between successive operations in a multistage production system. This use of transfer lots usually results in a significantly shorter makespan for the schedule. We study the structural properties of schedules which minimize the makespan for a single job with attached setup times in a flow shop. The structure of the optimal schedules is more complex than in the case with no setups or detached setups, as it may follow a much larger variety of patterns. Using the structural insights obtained, however, it is possible to find the optimal solution with s sublots in O(s) time for the three-machine case.Keywords
This publication has 14 references indexed in Scilit:
- Lot streaming in the two-machine flow shop with setup timesAnnals of Operations Research, 1995
- Optimal lot streaming for multiple products in a two-machine flow shopEuropean Journal of Operational Research, 1995
- Basic Techniques for Lot StreamingOperations Research, 1993
- A comparative study of lot streaming proceduresOmega, 1993
- Two- and three-machine flow shop scheduling problems with equal sized transfer batchesInternational Journal of Production Research, 1992
- Unit sized transfer batch scheduling with setup timesComputers & Industrial Engineering, 1992
- Solution Procedures for the Lot‐Streaming ProblemDecision Sciences, 1990
- Flow shop scheduling with lot streamingOperations Research Letters, 1989
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”Management Science, 1976
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity ModelManagement Science, 1975