Heuristics in flow shop scheduling with sequence dependent setup times
- 1 March 1992
- Vol. 20 (2) , 215-225
- https://doi.org/10.1016/0305-0483(92)90075-i
Abstract
No abstract availableKeywords
This publication has 7 references indexed in Scilit:
- On the Srikar-Ghosh MILP model for the iVx M SDST flowshop problemInternational Journal of Production Research, 1990
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up timesInternational Journal of Production Research, 1986
- A heuristic proǵramminǵ procedure for sequencinǵ the static flowshopInternational Journal of Production Research, 1982
- Heuristic “Optimization”: Why, When, and How to Use ItInterfaces, 1981
- A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing ProblemsOperations Research, 1975
- Heuristic Algorithms for Multistage Flowshop Scheduling ProblemA I I E Transactions, 1972
- THE TRANSPORTATION PROBLEM AND THE VOGEL APPROXIMATION METHODDecision Sciences, 1970