A survey of scheduling problems with setup times or costs
Top Cited Papers
- 1 June 2008
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 187 (3) , 985-1032
- https://doi.org/10.1016/j.ejor.2006.06.060
Abstract
No abstract availableKeywords
This publication has 256 references indexed in Scilit:
- Minimizing flow-time on a single machine with integer batch sizesOperations Research Letters, 2005
- Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setupsComputers & Industrial Engineering, 2005
- Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraintsComputers & Industrial Engineering, 2004
- Earliness/tardiness scheduling with a common due date and family setupsComputers & Industrial Engineering, 2004
- Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion timeComputers & Industrial Engineering, 2004
- A heuristic approach to batching and scheduling a single machine to minimize setup costsComputers & Industrial Engineering, 2004
- The complexity of two group scheduling problemsJournal of Scheduling, 2002
- Parallel machine scheduling with a common serverDiscrete Applied Mathematics, 2000
- A heuristic for scheduling two-machine no-wait flow shops with anticipatory setupsOperations Research Letters, 2000
- Scheduling for parallel dedicated machines with a single serverNaval Research Logistics (NRL), 2000