Production scheduling algorithms for a semiconductor test facility
- 1 January 1991
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Semiconductor Manufacturing
- Vol. 4 (4) , 270-280
- https://doi.org/10.1109/66.97809
Abstract
No abstract availableThis publication has 8 references indexed in Scilit:
- Scheduling Semiconductor Test Operations: Optimization and ApproximationPublished by Springer Nature ,1992
- A scheduling rule for job release in semiconductor fabricationOperations Research Letters, 1988
- The Shifting Bottleneck Procedure for Job Shop SchedulingManagement Science, 1988
- Bottleneck starvation indicators for shop floor control (semiconductor manufacturing process)IEEE Transactions on Semiconductor Manufacturing, 1988
- Closed-loop job release control for VLSI circuit manufacturingIEEE Transactions on Semiconductor Manufacturing, 1988
- Scheduling semiconductor wafer fabricationIEEE Transactions on Semiconductor Manufacturing, 1988
- The one-machine sequencing problemEuropean Journal of Operational Research, 1982
- Optimal Sequencing of a Single Machine Subject to Precedence ConstraintsManagement Science, 1973