Scheduling in stochastic flowshops with independent setup, processing and removal times
- 1 October 1997
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 24 (10) , 955-960
- https://doi.org/10.1016/s0305-0548(97)00006-3
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum latenessComputers & Operations Research, 1996
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic BreakdownsJournal of the Operational Research Society, 1995
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective functionEuropean Journal of Operational Research, 1995
- Single-machine scheduling subject to stochastic breakdownsNaval Research Logistics (NRL), 1990
- Stochastic Minimization of the Makespan in Flow Shops with Identical Machines and Buffers of Arbitrary SizeOperations Research, 1990
- Sequency on two and three machines with setup, processing and removal times separatedInternational Journal of Production Research, 1983
- Sequencing n jobs on two machines with setup, processing and removal times separatedNaval Research Logistics Quarterly, 1982
- Minimizing the Expected Makespan in Stochastic Flow ShopsOperations Research, 1982
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954