On the measurement of complexity in activity networks
- 1 October 1980
- journal article
- research article
- Published by Elsevier in European Journal of Operational Research
- Vol. 5 (4) , 223-234
- https://doi.org/10.1016/0377-2217(80)90053-3
Abstract
No abstract availableThis publication has 19 references indexed in Scilit:
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental InvestigationManagement Science, 1976
- Solving Large Single-Model Assembly Line Balancing Problems—A Comparative StudyA I I E Transactions, 1975
- Project Network Summary Measures Constrained- Resource SchedulingA I I E Transactions, 1975
- An Experimental Investigation of Resource Allocation in Multiactivity ProjectsJournal of the Operational Research Society, 1973
- MALB—A Heuristic Technique for Balancing Large Single-Model Assembly LinesA I I E Transactions, 1973
- Optimal Linear OrderingSIAM Journal on Applied Mathematics, 1973
- New Criterion for Resource SchedulingTransportation Engineering Journal of ASCE, 1973
- Conditional Monte Carlo: A Simulation Technique for Stochastic Network AnalysisManagement Science, 1971
- An Algorithm for Optimal Project Scheduling under Multiple Resource ConstraintsManagement Science, 1971
- Assembly-Line Balancing—Dynamic Programming with Precedence ConstraintsOperations Research, 1963