Production loss functions and subjective assessments of forecast errors: untapped sources for effective master production scheduling
- 1 January 1995
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 33 (1) , 137-159
- https://doi.org/10.1080/00207549508930141
Abstract
Master production scheduling is complicated by demand uncertainty. The problem from uncertain forecasts is scheduling either too few or too many components relative to actual demand. To cope with this problem, schedulers often form judgments about future forecasts and they adapt production schedules to reflect beliefs and opinions about forecast errors. The research literature on scheduling has largely ignored formal methods for capturing these informal judgments and injecting them explicitly, rather than informally, into the master scheduling process. The current research demonstrates a method for using subjective assessments of forecast accuracy to improve master scheduling. First, a production loss function is derived using performance data from computer simulations of the production environment. Second, subjective assessments of forecasts errors are integrated with the loss function to reveal how forecasts should be adjusted to minimize expected scheduling losses. The procedure enhances intuitive judgmental scheduling; it reveals how managerial beliefs can be formally used to intentionally and optimally bias forecasts. In applying the procedure to 44 simulated MRP configurations, the optimally-biased forecasts are superior to unadjusted forecasts and provide an objective benchmark for using judgmental adjustments. The results demonstrate opportunities for enhancing master schedules by using subjective assessments of forecasts compared with scheduling without subjective assessments.Keywords
This publication has 22 references indexed in Scilit:
- A Model for Master Production Scheduling in Uncertain EnvironmentsDecision Sciences, 1992
- Master Production Scheduling Under Rolling Planning Horizons with Fixed Order IntervalsDecision Sciences, 1992
- Freezing the Master Production Schedule Under Demand UncertaintyDecision Sciences, 1990
- Location of Inventories in an MRP EnvironmentDecision Sciences, 1988
- MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONSDecision Sciences, 1988
- AN EVALUATION OF FORECAST ERROR IN MASTER PRODUCTION SCHEDULING FOR MATERIAL REQUIREMENTS PLANNING SYSTEMS.Decision Sciences, 1987
- The impact of a rolling schedule in a multi‐level MRP systemJournal of Operations Management, 1982
- HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEMDecision Sciences, 1979
- Cognitive Processes and the Assessment of Subjective Probability DistributionsJournal of the American Statistical Association, 1975
- The Assessment of Prior Distributions in Bayesian AnalysisJournal of the American Statistical Association, 1967