A heuristic for network project scheduling with random activity durations depending on the resource allocation
- 1 July 1998
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 55 (2) , 149-162
- https://doi.org/10.1016/s0925-5273(98)00044-9
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Stochastic network project scheduling with non-consumable limited resourcesInternational Journal of Production Economics, 1997
- Resource-constrained project scheduling by simulated annealingInternational Journal of Production Research, 1996
- Production control in semi-automated systems: comparison between constant and stochastic speedsProduction Planning & Control, 1996
- A heuristic scheduling algorithm for improving the duration and net present value of a projectInternational Journal of Operations & Production Management, 1995
- Development of a heuristic project scheduler under resource constraintsEuropean Journal of Operational Research, 1994
- Heuristics for scheduling resource-constrained projects in MPM networksEuropean Journal of Operational Research, 1994
- Scheduling under a Non-renewable Resource ConstraintJournal of the Operational Research Society, 1991
- A nonlinear minimax allocation problem with multiple knapsack constraintsOperations Research Letters, 1991
- Planning and control in research and developmentOmega, 1990
- Critical path analysis and resource constrained project scheduling — Theory and practiceEuropean Journal of Operational Research, 1985