A robust production control policy for VLSI wafer fabrication
- 1 January 1989
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Semiconductor Manufacturing
- Vol. 2 (4) , 159-164
- https://doi.org/10.1109/66.44620
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Scheduling job shops with delaysPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2005
- Tutorial: scheduling manufacturing systems with FACTORPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Optimal control rules for scheduling job shopsAnnals of Operations Research, 1989
- Applying just-in-time in a wafer fab: a case studyIEEE Transactions on Semiconductor Manufacturing, 1989
- Bottleneck starvation indicators for shop floor control (semiconductor manufacturing process)IEEE Transactions on Semiconductor Manufacturing, 1988
- Closed-loop job release control for VLSI circuit manufacturingIEEE Transactions on Semiconductor Manufacturing, 1988
- Scheduling semiconductor wafer fabricationIEEE Transactions on Semiconductor Manufacturing, 1988
- Optimal control of production rate in a failure prone manufacturing systemIEEE Transactions on Automatic Control, 1986
- An Algorithm for the Computer Control of a Flexible Manufacturing SystemIIE Transactions, 1983
- Scheduling of re‐entrant flow shopsJournal of Operations Management, 1983