Total flowtime in no-wait flowshops with separated setup times
- 30 September 1998
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 25 (9) , 757-765
- https://doi.org/10.1016/s0305-0548(98)00002-1
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- Scheduling in stochastic flowshops with independent setup, processing and removal timesComputers & Operations Research, 1997
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in ProcessOperations Research, 1996
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic BreakdownsJournal of the Operational Research Society, 1995
- Two-machine group scheduling problem with blocking and anticipatory setupsEuropean Journal of Operational Research, 1993
- Job lateness in a two-machine flowshop with setup times separatedComputers & Operations Research, 1991
- Solvable Cases of the No-wait Flow-shop Scheduling ProblemJournal of the Operational Research Society, 1991
- Heuristic algorithms for continuous flow-shop problemNaval Research Logistics (NRL), 1990
- Sequency on two and three machines with setup, processing and removal times separatedInternational Journal of Production Research, 1983
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion timesNaval Research Logistics Quarterly, 1982
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979