A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMES
- 1 September 2000
- journal article
- review article
- Published by SAGE Publications in Production and Operations Management
- Vol. 9 (3) , 262-282
- https://doi.org/10.1111/j.1937-5956.2000.tb00137.x
Abstract
No abstract availableKeywords
This publication has 87 references indexed in Scilit:
- A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup timesIIE Transactions, 1999
- Scheduling the fabrication and assembly of components in a two-machine flowshopIIE Transactions, 1999
- Lot streaming with attached setups in three-machine flow shopsIIE Transactions, 1998
- A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs-a case studyProduction Planning & Control, 1997
- Scheduling a flow-line manufacturing cell: a tabu search approachInternational Journal of Production Research, 1993
- Flow shop scheduling in serial multi-product processes with transfer and set-up timesInternational Journal of Production Research, 1992
- Two- and three-machine flow shop scheduling problems with equal sized transfer batchesInternational Journal of Production Research, 1992
- Flowshop scheduling with set-up, processing and removal times separatedInternational Journal of Production Research, 1991
- On the Srikar-Ghosh MILP model for the iVx M SDST flowshop problemInternational Journal of Production Research, 1990
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up timesInternational Journal of Production Research, 1986